Home -> My mountain trips -> September 27th, 2004 -> Picture # 18
18. At the end (155 kB) [Index] - [<<] - [>>] - [All for September 27th, 2004] - []
Just before getting out to the rim, at 2050m elevation (the river flows at 700m) a tunnel was dug in a rock which couldn't be avoided. Already the darkness fell; I was dead tired but very happy, after an unique experience!